article · Journal of Science and Technology
This work studies the cost benefits derivable from network reconfiguration and shunt compensation of a Nigerian 33 kV distribution network. The approach adopted requires that the base case power flow analysis of the distribution network was first carried out, after which a shunt capacitor was used for compensation. The introduction of a tie-line in the network and a combination of capacitor and tie-line on same network were also carried out. The costs analysis of compensation and reconfiguration was carried out to understand their financial worthiness. The results obtained showed that the payback period (PP) for the introduction of compensation only, reconfiguration only and combination of compensation and reconfiguration are 1286.89 hr, 328.58 hr and 1043.31 hr, respectively. Though, reconfiguration only gives the least PP, a combination of compensation and reconfiguration has a long time cost benefit. At time above 5147.57 hr, it generates more profit than others.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.30880/jst.2023.15.01.003
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.