article · Engineering Computations
Purpose Choosing the right contractor is very important for the successful management of construction projects, especially when it comes to road maintenance. In order to improve the contractor for road maintenance, this study aims to create a thorough and efficient multiple-criteria decision-making (MCDM) model that goes beyond price-only assessments to include a wider range of criteria. Design/methodology/approach The study used both the Fuzzy Analytic Hierarchy Process (F-AHP) and the Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS). There were six main groups of 26 sub-criteria: Contract Bid Price and Financial Capacity, Technical Capacity, Experience, Management Capacity, Safety and Environment. F-AHP was used to figure out how important each of these groups was compared to the others. TOPSIS was then used to rank possible contractors based on these weighted criteria. Findings The analysis showed that some criteria were especially important when choosing a contractor. Bid Price, Financial Performance, History of Non-Performance of Contracts, and Timely Completion of Projects were the most important factors in deciding whether a contractor was right for the job. These results show how important it is to use both financial and performance-related indicators when evaluating the appropriate contractor. Originality/value By addressing significant flaws in the conventional selection model, this study offers a fresh methodical approach to contractor evaluation. It provides a standard for enhancing the Roads Administration's procurement procedures and establishes a strong basis for upcoming studies and policy creation targeted at boosting accountability, efficacy and transparency in the execution of road maintenance.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.1108/ec-07-2025-0779
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.