MARATTO

article · International Journal of Industrial and Systems Engineering

Integrating non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line with stochastic dependence

Abstract

This paper investigates the integrated non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line. We consider the stochastic dependence between the components of each subsystem. This problem has not been studied so far in the literature even though it represents a realistic configuration. First, we compute the available production capacity restricted by the stochastic dependence. Then, an integer linear program is used to determine the optimal production plan and preventive maintenance schedule. The results show that ignoring the stochastic dependence effect causes many unexpected consequences and additional production and maintenance costs. This work provides practitioners with a set of managerial insights to develop adequate integrated production and maintenance policies.

Research topics

  • Management and Optimization Techniques
  • Reliability and Maintenance Optimization
  • Assembly Line Balancing Optimization

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1504/ijise.2024.139559

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.