INHIBITING FACTORS OF COST PERFORMANCE IN CONSTRUCTION PROJECTS - A CRITICAL REVIEW

2024Open accessAin Shams University

Abstract

Building projects worldwide face significant cost performance challenges due to cost overruns, with 30% underperforming on cost. Overruns were 80% of the global building projects, and this issue was a repetitive phenomenon. The study performed an investigation for the elements of poor construction cost performance due to exceeding budgeted costs. Comparative analysis was conducted at a global level, identifying common factors affecting project expenses. Also, The paper analyzed the driven elements contributing to this problem, focusing on understanding the causative elements. Following PRISMA guidelines. the study identified prevailed overruns factors affected project budgets and presented mitigation measures. Comprehensive guidelines were established to direct project costs management and control budget overruns. A protocol was developed to identify, evaluate, and manage key elements leading to overruns, helping to avoid overruns, stay on budget, and achieve economic benefits.

Research topics

  • Construction Project Management and Performance
  • BIM and Construction Integration
  • Quality and Supply Management

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.21608/auej.2024.304403.1684

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.