article · Journal of Advanced Engineering Trends
A lot of efforts have focused on eliminating the annual cost lost in random maintenance decisions by applying the Pavement Maintenance Management System (PMMS). The PMMS is a systematic approach for achieving effective management of maintenance decision selection. This study aims to clarify the extent of the difference between PMMS and the traditional aspect of maintenance decision-making. Therefore, a visual inspection survey was conducted for a length of 8.25 km of the Cairo-Aswan Agriculture Highway, Minia City, Egypt. Data was collected from one branch that was divided into two sections, 1 and 2 in right and left directions respectively. A total of 41 samples were surveyed per section, which was stored in a database file using GIS software. The PCI was calculated to determine whether maintenance or rehabilitation (M & R) decisions should be applied in sections one and two. The appropriate M & R for section 1 was "Thin Overlay without Milling," and for section 2 was "Milling and Overlay." These results were different than the decision taken by the responsible authorities, as they decided to do Milling and Overlay for the two sections.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.21608/jaet.2022.144511.1191
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.