MARATTO

article · Journal of Financial Management of Property and Construction

Implementing lean construction to improve quality and megaproject construction: a case study

Abstract

Purpose This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects. Design/methodology/approach This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process. Findings Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators. Research limitations/implications This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used. Originality/value This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Research topics

  • Construction Project Management and Performance
  • Quality and Supply Management
  • Occupational Health and Safety Research

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1108/jfmpc-12-2022-0063

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.