article
In Burkina Faso, significant initiatives are underway to link multiple Solar Photovoltaic Power plants to the national grid and establish connections with neighboring West African Nations. This endeavor requires careful consideration due to the intermittent nature of Photovoltaic (PV) power generation and the rising electricity demand in Burkina Faso, both of which impact the grid's flexibility. The primary objective of this study is to model the national electrical grid to pinpoint optimal connection sites for photovoltaic solar power plants using PSAT /SIMULINK in MATLAB environment. Initially, this research used the Continuation Power Flow (CPF) technique alongside Burkina Faso's grid code criteria to identify the weakest buses, ensuring that nominal voltage deviations did not exceed ±5%, highlighting Zagtouli, Komsilga, Ouahigouya, Patte d'Oie, Ouaga 1, Ouaga 2, Kossodo, Yaramoko, Wona Hounde, and Ouaga 2000 as the most vulnerable in terms of voltage. The introduction of a 40 MWp solar PV generator at each of these low-voltage points has resulted in an overall network voltage improvement. However, voltage irregularities persist at certain buses. To optimize the injection of PV power flow, a network restructuring is necessary.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.1109/mne3sd63831.2024.10812154
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.