Eco-Friendly Scheduling Model for Construction Projects Utilizing Genetic Algorithms

20242 citationsOpen accessPort Said University

Abstract

An assessment of construction activities related to pollution needs to be conducted during the planning of a given project. Such an assessment is essential to ensure that the resulting pollution does not surpass the environmental threshold limits. This research provides an optimized pollution-based scheduling model in construction projects by applying Genetic Algorithms (GAs). The suggested approach figures out the pollution produced by gasses, noise, and dust for each activity in the project. Then, the whole project’s duration is minimized by optimizing the project schedule using GAs while keeping the different pollutants under threshold limits. In the developed model, each pollutant is handled as a dummy resource and is incorporated into the schedule of construction projects. When the emitted pollutants surpass the allowable limits, as per the given regulations, GAs re-schedule the project tasks so that the pollution levels are reduced and redistributed. The proposed framework is presented as being practically applicable through an actual case study. The results show that the proposed GA model improves the pollution leveling process more efficiently than the standard resource leveling technique in Microsoft Project, producing fewer pollution histogram moments of the X and Y axes with 9.4% and 2.2%, respectively. Sensitivity analysis reveals that the best solutions for this case study are obtained when population size, offspring generation, crossover rate, and mutation rate equal 100, 50, 0.95, and 0.05, respectively. The model can aid in reducing construction projects’ environmental impact during the project planning and construction stages, which benefits decision-makers and project planners.

Research topics

  • Resource-Constrained Project Scheduling
  • BIM and Construction Integration
  • Construction Project Management and Performance

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.3390/su162411164

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.