MARATTO

article · Results in Engineering

Development and optimization of PIR and QIR strategies of maintenance using Monte Carlo method

Abstract

The optimization of condition-based maintenance (CBM) strategies is conventionally formulated as the minimization of the long-run expected maintenance cost rate. While this criterion provides a rigorous and economically meaningful measure of asymptotic performance, it does not explicitly account for the variability of maintenance costs across renewal cycles. As a result, its applicability may be limited in industrial environments where budgetary stability, operational reliability, and risk mitigation are critical considerations. This study proposes a robustness-aware optimization framework for two representative CBM policies: Periodic Inspection and Replacement (PIR) and Quantile-Based Inspection and Replacement (QIR). The principal contribution lies in the formulation of a unified decision criterion that jointly incorporates the long-run expected maintenance cost rate and the dispersion of maintenance costs at the renewal-cycle level. This criterion enables a systematic and coherent comparison of maintenance strategies that extends beyond traditional average-cost-based evaluations. System degradation is modeled as a homogeneous Gamma process, a widely adopted stochastic model that combines analytical tractability with strong empirical relevance. Closed-form analytical expressions are derived for the PIR strategy, whereas a fully specified Monte Carlo–based estimation framework is developed for the QIR strategy to accommodate its state-dependent and non-periodic inspection structure. A comprehensive sensitivity analysis is performed with respect to the inspection cost, the downtime cost rate, and the robustness-weight parameter, providing a structured comparative assessment over a broad spectrum of economic conditions. The results reveal an intrinsic trade-off between economic efficiency and cost stability. They further demonstrate that the QIR strategy generally achieves a superior compromise between performance and robustness under moderate cost conditions, whereas the PIR strategy remains advantageous in operational settings characterized by elevated inspection costs or fixed scheduling constraints.

Research topics

  • Reliability and Maintenance Optimization
  • Engineering and Test Systems
  • Machine Fault Diagnosis Techniques

Read the original research

This page summarises published work. The authoritative version sits with the publisher.

DOI: 10.1016/j.rineng.2026.111609

Is something wrong with this record? Report it or request removal.

Discussion

Discuss this research

Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.

No discussion yet. Open the first thread.