article · IEEE Access
The digitalization of data has recently had an impact on the building industry. Building information modeling (BIM) is a highly developed technology that is used to predict the cost, lifespan, energy use, and efficiency of buildings. To enhance the BIM accuracy of cost and time estimation currently, it’s easier than before by Using evolutionary algorithms (EA), which include contemporary algorithms like evolutionary strategies (ES), evolutionary programming (EP), particle swarm optimization (PSO), differential evolution (DE), and genetic algorithms (GA), the integration of artificial intelligence (AI). This study uses a code (plugin) created by GA and integrated into the BIM-5D model via Navisworks as a plugin to reduce the overall time and cost of construction projects. The plugin code, developed with Microsoft Visual Studio and the C# programming language, is an interface that enhances the accuracy of time and cost during construction stages with various five project time scenarios. The study’s findings indicate that the suggested plugin reduces project time by roughly 20% while also saving various amounts of money.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.1109/access.2023.3317137
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.