article · Journal of Engineering Technology and Applied Science (JETAS)
A consistent power supply is indispensable across various sectors, spanning from households to critical institutions like research facilities, hospitals, and financial institutions. This study endeavors to ensure uninterrupted power provision to a load through an automated selection process among three primary power sources: main power, solar energy, and generator power, with main power being the primary preference. Implemented using an 8051 microcontroller, the system is linked to three switches representing each power source for simulation purposes. Upon detection of a switch release or deactivation, signifying the absence of that particular power source, the microcontroller promptly deactivates the corresponding relay driver. This relay driver then switches the relevant relay, facilitating seamless power continuity to the load if any switch is activated. A lamp or bulb serves as a demonstrative load powered by the primary source. In the event of a power outage, the system seamlessly transitions to the next available source, such as solar energy, and if required, to generator power. An LCD is employed to indicate the currently active power source, ensuring operational transparency and facilitating swift troubleshooting when necessary.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.36079/lamintang.jetas-0601.632
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.