article · Buildings
This study develops an optimized multi-story Trombe Wall (MTW) as a hybrid passive system for heating, cooling, and PV electricity generation. Unlike previous research, which focused on single-story applications and heating efficiency, this study explores MTW performance in hot climates. The methodology includes four phases: identifying TW design parameters, selecting and validating a case study, applying a two-stage optimization, and developing predictive equations. Results show that the MTW achieves up to a 1.94 °C decrease in cooling mode, a 1.56 °C increase in heating mode, a 40% increase in thermal comfort hours, and a 31% rise in annual PV electricity generation. Finally, the developed regression models demonstrated strong predictive capability (R2 = 70.2–95.73%) for discomfort and electricity generation. The proposed MTW provides a cost-effective and sustainable solution, supporting designers and researchers in optimizing building performance.
This page summarises published work. The authoritative version sits with the publisher.
DOI: 10.3390/buildings15071150
Is something wrong with this record? Report it or request removal.
Discussion
Have you built on this work, tried to replicate it, or seen it applied in practice? Share what you know. Verified researchers and MARATTO™ domain experts can open a discussion, and any member can reply. Contributions are reviewed before they appear.
No discussion yet. Open the first thread.
New to MARATTO™? Create a free account.